Espresso Machine Boiler Inspections
Ensure your coffee machine’s safety and compliance with an annual PSSR boiler inspection. This examination covers the boiler and safety systems, confirming your machine’s safe and efficient operation.
PSSR 2000 Inspections
For coffee machines with pressurised steam, annual boiler inspections are essential.
Many cafes aren’t unaware that their coffee machines require yearly boiler inspections to be legally compliant with PSSR 2000 regulations. The pressurised steam systems within these machines must be regularly examined to maintain their safe operation.
Our engineers can carry out boiler inspections independently or assist your insurance company if they provide their own inspections.
- Our boiler inspections are carried out to PSSR 2000 standards and accredited by Coffee Safe
- Yearly inspections ensure that your equipment is compliant and that the safety systems are working correctly
- Not having inspections could put you at risk of invalidating insurance and putting your business at risk
WHAT OUR CLIENTS THINK
Don’t just take our word for it
Boiler Inspection FAQ's
Is a boiler inspection necessary?
If your coffee machine operates using pressurised steam, it’s crucial to plan for an annual boiler inspection. This evaluation ensures that the pressurised vessel and valves of your coffee maker remain in excellent condition, keeping it running safely and efficiently.
How often should I schedule a boiler inspection?
According to the Pressure Systems Safety Regulations (2000), it’s mandatory to conduct a commercial coffee machine inspection once you have had it for 14 months. Following that, we advise arranging inspections at approximately one-year intervals. However, the inspection frequency may fluctuate depending on the specific machine type and its usage patterns.
What does a boiler inspection entail?
In the course of a PSSR inspection, our fully trained Engineers will carry out a comprehensive safety evaluation of your coffee machine. This entails a meticulous examination of the pressurised vessel and valves to ensure they are in excellent condition. During the inspection, your machine will be temporarily unavailable for use.
The duration of the inspection typically takes around 30 minutes under ideal conditions. However, if any issues are detected with your machine, it may require additional time if we need to repair or replace certain parts.
Once the inspection is finalised, you will receive an IOSH certificate as as proof of compliance with safety regulations.